×

cushion cap meaning in Chinese

承台

Examples

  1. If there is no over burden at the river bed , the steel pipe pile cannot be inserted , the floating platform will be adopted , during overwater construction , the author ( using zhong - 60 floating box , etc . ) assembled 40t floating crane by his own design , in this way , the floating crane completed the work of overwater transporting and lifting , such as the transporting of s teel pipe pile , inserting , the erecting of overwater construction platform , overwater moving of drill grid crane , lifting of lifting box of cushion cap , pulling out of steel pipe pile
    在水上作业中,作者利用中- 60浮箱等设备自行设计、拼制了40t浮吊,完成了水上运输、水上起重等作业,如钢管桩的运输、插打、水上施工平台的搭设、钻机吊车的水上转移、承台吊箱的起吊、钢管桩的拔除等作业。

Related Words

  1. cushioning element
  2. cushion breaker
  3. cushion ship
  4. airbag cushion
  5. cushioned horn
  6. cushion coat
  7. cushion pad
  8. cushion beam
  9. cushion flow
  10. cushion dashpot
  11. cushion breaker
  12. cushion calender
  13. cushion capital
  14. cushion carom
PC Version

Copyright © 2018 WordTech Co.